Table 4-5 - Inspection intervals.

For the output stage bearings (HSS bearings, rotor side and generator side) the velocity RMS limits are 3.5 mm/s (alert) and 4.5 mm/s (alarm). Above the alarm level, plan a bearing inspection and reduce load if the trend keeps rising.

Table t06

RowTaskInterval
2Visual inspection and leak check6 months
3Oil sampling and laboratory analysis6 months
4Endoscope inspection of gear teeth and bearings24 months
5Vibration monitoring (condition monitoring system)continuous
6Filter element replacement12 months
7Oil cooler radiator cleaningas required