FICTIONAL - NOT FOR OPERATIONAL USE # Shift handover - 2026-07-15 (day shift to night shift) Written by: Callum Rydings, Lead Wind Technician Site: Quellmoor Ridge Wind Farm ## Status - Grid curtailment day 2 of 3 (CPL-CI-2026-018): park export limited to 20 MW from 08:00 to 18:00. All turbines back to normal at 18:00. - WTG-03, WTG-04 and WTG-05 will stop tonight from 22:00 if the wind stays low (bat curtailment). This is normal, do not reset. - WTG-07: HSS bearing vibration still around 5.3 mm/s. Oil temperature normal since the fan motor replacement. WO-26-0412 is waiting for the bearing. - WTG-04: drone check of blade B on 2026-07-02, crack unchanged at 0.9 m. ## Work done today - WTG-05 daily checklist CHK-05 completed yesterday, all items OK. - Rescue kit inspections on WTG-01 to WTG-04 (MP-HSE-01). - Radiator cleaning MP-GBX-07 on WTG-03 postponed to next week. ## For the next shift - Watch the WTG-07 oil temperature in the afternoon. - The spill kit of WTG-12 needs a refill (AWI-20915). FICTIONAL - NOT FOR OPERATIONAL USE