LIFT PLAN LP-2026-009

OCR confidence: 0.95

Crop of b0029

Page 2 of 2

OCR confidence: 0.99

Crop of b0032

exclusion zone R = 150 m

OCR confidence: 0.97

Crop of b0033

assist crane 100 t

OCR confidence: 0.74

Crop of b0034

prevailing wind from SW

OCR confidence: 0.99

Crop of b0035

R 26 m

OCR confidence: 0.99

Crop of b0036

WTG-04 tower

OCR confidence: 0.98

Crop of b0037

crane TS-600C-02

OCR confidence: 0.97

Crop of b0038

blade laydown area

OCR confidence: 0.72

Crop of b0039

50 m

OCR confidence: 0.91

Crop of b0041

1. Pre-lift meeting; PTW signed by both parties.

OCR confidence: 0.99

Crop of b0042

2. Rotor locked with blade B pointing down; pitch system isolated.

OCR confidence: 0.93

Crop of b0043

3. Blade yoke fitted and load test at 0.5 m above the laydown area.

OCR confidence: 0.96

Crop of b0044

4. Blade B unbolted and lowered with both tag lines manned.

OCR confidence: 0.98

Crop of b0045

5. New blade lifted, bolted and torqued per Litware instruction.

OCR confidence: 0.98

Crop of b0046

6. Exclusion zone released only by the appointed person.

OCR confidence: 0.98

Crop of b0048

Prepared: Bram Okkerse, Appointed Person

OCR confidence: 1.00

Crop of b0050

19/08/26

OCR confidence: 0.88

Crop of b0051

Approved: Dario Penwarden, O&M Supervisor

OCR confidence: 1.00

Crop of b0053

21/08/26

OCR confidence: 0.86

Figure f01

Figure f01

Generated description — written by a model from the figure image; not verified against the source.

A simple site-plan diagram shows a dashed circular exclusion zone labeled “R = 150 m” with an arrow indicating “prevailing wind from SW.” Inside the circle are labeled rectangular areas for an “assist crane 100 t,” a “crane TS-600C-02” near a marked “WTG-04 tower” point with “R 26 m,” and a “blade laydown area” near the bottom. A 50 m scale bar appears at the lower left.