FICTIONAL - NOT FOR OPERATIONAL USE SHIFT HANDOVER 2026-07-29 - day shift By: Callum Rydings WTG-02: the endoscope inspection on 23/07 found spalling on the HSS bearing (generator side). WO-26-0439 raised on 24/07, waiting for the same bearing as WTG-07 (FGT-P-22328). Turbine kept in operation, vibration reviewed weekly. WTG-11: small hydraulic oil leak at a yaw brake hose found today. The hose AWI-10442 is not stocked, order to be raised. Leak contained with absorbent pads and checked every shift. WTG-05: rescue kit inspection started (WO-26-0444), to finish next week. WTG-07: no oil temperature alarm since 24/06. Night: WTG-03, WTG-04 and WTG-05 bat curtailment expected again (low wind). FICTIONAL - NOT FOR OPERATIONAL USE