Source page: SOP-LOTO-001 Rev. C - Lockout/tagout of wind turbines · Original file: original.docx · Provenance: ✓ quote verified (native text)
Text
Try to start the turbine from the local panel, test for absence of voltage at the converter and read 0 bar on the accumulator gauges before work starts.