SB-LWS-2025-11 is service bulletin number SB-LWS-2025-11, revision A, titled Pitch bearing bolt re-torque.1 The maintenance plan for Quellmoor Ridge Wind Farm includes pitch bearing bolt re-torque task MP-PIT-01, covering 100% of bolts at 1,450 Nm every 12 months, and referencing SB-LWS-2025-11 Rev. A.2 Work orders through 2026-08-31 show pitch bearing bolt re-torque work completed for WTG-01 through WTG-06 and planned for WTG-07 through WTG-12, with 1,450 Nm and 100% of bolts, referencing SB-LWS-2025-11 Rev. A.34567891011121314
Facts
- The bulletin number is SB-LWS-2025-11 and the revision is A.1
- Pitch bearing bolt re-torque task MP-PIT-01 covers 100 % of bolts at 1,450 Nm, is scheduled every 12 months, and references SB-LWS-2025-11 Rev. A.2
- Pitch bearing bolt re-torque work for WTG-01 through WTG-06 was completed with a stated torque of 1,450 Nm and coverage of 100 % of bolts, referenced to SB-LWS-2025-11 Rev. A.345678
- Pitch bearing bolt re-torque work for WTG-07 through WTG-12 is planned for September 2026, with each title stating 1,450 Nm and 100 % of bolts and reference SB-LWS-2025-11 Rev. A.91011121314
Timeline
- 2025-11: Pitch bearing bolt re-torque task MP-PIT-01 covers 100 % of bolts at 1,450 Nm, is scheduled every 12 months, and references SB-LWS-2025-11 Rev. A.2
- 2025-11: Pitch bearing bolt re-torque work for WTG-01 through WTG-06 was completed with a stated torque of 1,450 Nm and coverage of 100 % of bolts, referenced to SB-LWS-2025-11 Rev. A.345678
- 2025-11: The bulletin number is SB-LWS-2025-11 and the revision is A.1
- 2026-09: Pitch bearing bolt re-torque work for WTG-07 through WTG-12 is planned for September 2026, with each title stating 1,450 Nm and 100 % of bolts and reference SB-LWS-2025-11 Rev. A.91011121314
Documents
- SB-LWS-2025-11 Rev. A - Pitch Bearing Bolt Re-torque
- Maintenance Plan 2026, Issue 2 — Quellmoor Ridge Wind Farm
- Work Orders Export through 2026-08-31
Related
- Topics: Blades, pitch bearings and main-component lifts, Gearbox lubrication and oil changes, Gearbox temperature, vibration and oil analysis, Generator brushes and electrical systems, Safety, isolation and work at height, Spare parts, stock levels and supply
Sources
Footnotes
-
SB-LWS-2025-11 Rev. A - Pitch Bearing Bolt Re-torque — p. 1 · ✓ quote verified ↩ ↩2 ↩3
-
Maintenance Plan 2026, Issue 2 — Quellmoor Ridge Wind Farm — sheet "Tasks", row 11 · table ↩ ↩2 ↩3
-
Work Orders Export through 2026-08-31 — row 45 · table ↩ ↩2 ↩3
-
Work Orders Export through 2026-08-31 — row 46 · table ↩ ↩2 ↩3
-
Work Orders Export through 2026-08-31 — row 47 · table ↩ ↩2 ↩3
-
Work Orders Export through 2026-08-31 — row 48 · table ↩ ↩2 ↩3
-
Work Orders Export through 2026-08-31 — row 49 · table ↩ ↩2 ↩3
-
Work Orders Export through 2026-08-31 — row 50 · table ↩ ↩2 ↩3
-
Work Orders Export through 2026-08-31 — row 90 · table ↩ ↩2 ↩3
-
Work Orders Export through 2026-08-31 — row 91 · table ↩ ↩2 ↩3
-
Work Orders Export through 2026-08-31 — row 92 · table ↩ ↩2 ↩3
-
Work Orders Export through 2026-08-31 — row 93 · table ↩ ↩2 ↩3
-
Work Orders Export through 2026-08-31 — row 94 · table ↩ ↩2 ↩3
-
Work Orders Export through 2026-08-31 — row 95 · table ↩ ↩2 ↩3