Source page: Monthly O&M Review Minutes – 2026-06-18 · Original file: original.docx · Provenance: ✓ quote verified (native text)

Text

8D INC-2026-006 was opened on 2026-05-30. WTG-07 has been limited to 2.6 MW since 2026-06-01. Oil analysis TR-OA-2026-0614 arrived on 2026-06-17 with condition ALERT (iron 64 ppm). Callum Rydings will inspect the cooler fan and the radiator; the inspection is planned for 2026-06-24.