FICTIONAL SAMPLE - Contoso Renewables, Quellmoor Ridge Wind Farm and every organisation, person, product and value in this wiki are invented. Not for operational use.
Tailspin Heavy Lift is an organisation involved in planning a crane lift for the WTG-04 blade replacement.12 Bram Okkerse of Tailspin Heavy Lift is the appointed person for this lift plan.1
Facts
- Bram Okkerse of Tailspin Heavy Lift is the appointed person, and Dario Penwarden of Contoso Renewables is the client supervisor.1
- The crane lift for the WTG-04 blade replacement was to be planned with Tailspin Heavy Lift for early September.2
Timeline
No dated facts.
Documents
Related
- Topics: Blades, pitch bearings and main-component lifts, Environmental permit and night curtailment, Gearbox temperature, vibration and oil analysis, Grid connection and grid operator instructions, Safety, isolation and work at height, Spare parts, stock levels and supply
Sources
Footnotes
-
Lift Plan LP-2026-009 - WTG-04 Blade B Replacement — p. 1 · OCR ↩ ↩2 ↩3
-
Monthly O&M Review Minutes – 2026-06-18 — ¶ 12 · ✓ quote verified ↩ ↩2
Provenance badges✓ quote verified the quoted words were found verbatim in the source textOCR text recognised from an image; compare it with the image