FICTIONAL SAMPLE - Contoso Renewables, Quellmoor Ridge Wind Farm and every organisation, person, product and value in this wiki are invented. Not for operational use.

WTG-04 is a turbine at Quellmoor Ridge Wind Farm.123456789101112 It is subject to bat-protection curtailment and monitoring requirements under the current environmental permit.1314 In 2026, WTG-04 had a category 4 trailing-edge crack on blade B and was scheduled for replacement.151617

Facts

  • Bat activity must be monitored at the nacelle of WTG-04 with an acoustic detector from April to October each year.13
  • From 1 June to 31 August each year, WTG-03, WTG-04 and WTG-05 must be stopped between 22:00 and 05:00 local time whenever hub-height wind speed is below 6.0 m/s and air temperature is 10 °C or higher.13
  • Variation 2 was justified by the presence of a protected bat species maternity roost in Skelvane Wood, east of WTG-03, WTG-04 and WTG-05, with foraging near the turbines on warm, calm summer nights.13
  • WTG-04 had the highest overall blade category in the turbine summary: blade A category 2, blade B category 4, blade C category 2, and highest category 4.18
  • Finding F-01 is a category 4 trailing-edge crack on WTG-04 blade B.15
  • For F-01, repair is not recommended at that location and WTG-04 blade B is to be replaced before 2026-09-30.15
  • Until WTG-04 blade B is replaced, the crack is to be checked by drone every month and the turbine is to be stopped immediately if the crack exceeds 1.2 m.15
  • Finding F-02 is category 3 leading-edge erosion on WTG-04 blade B, with coating loss between radius 52 m and 57 m and no exposed laminate.15
  • The recommendations are to replace WTG-04 blade B before 2026-09-30 using a crane lift, repair category 3 findings within 6 months using rope access, and perform the next full inspection in May 2027.15
  • The job is the WTG-04 rotor blade B replacement, described as a single blade lift.19
  • The maximum gust is 11 m/s; no lift is allowed in fog with visibility below 300 m, lightning within 15 km, or icing, and wind is read at the WTG-04 nacelle anemometer and boom tip anemometer.19
  • The exclusion zone radius is 150 m around WTG-04 during the lift.19
  • WTG-03, WTG-04, and WTG-05 started S420 Curtailed - environmental condition around 22:00 on 2026-06-01 and ended the curtailment around 05:00 on 2026-06-02.202122232425
  • WTG-04 entered S310 Maintenance mode on 2026-08-07, raised and cleared A1001 Emergency stop activated during that maintenance period, and then ended S310.26272829
  • WTG-04 raised A2140 Gearbox oil filter differential pressure high at 2.89 bar on 2026-08-11 17:18:08 and cleared it at 1.90 bar on 2026-08-11 18:22:08.3031
  • WTG-03, WTG-04 and WTG-05 entered S420 Curtailed - environmental condition at 22:00 on 2026-08-25, and the curtailment ended at 05:00 on 2026-08-26.323334353637
  • WO-26-0355 for WTG-04 is a planned high-priority corrective-maintenance work order to replace rotor blade B for a trailing-edge crack, with planned date 2026-09-08 and references WBS-2026-031 and LP-2026-009.16
  • WTG-04 blade B had a category 4 trailing-edge crack and had to be replaced before 2026-09-30 under WO-26-0355.17
  • The crane lift for the WTG-04 blade replacement was to be planned with Tailspin Heavy Lift for early September.17
  • The bat protection curtailment season started on 1 June for WTG-03, WTG-04, and WTG-05 under permit condition 7.3.14
  • The turbine labels shown on the plan are WTG-01, WTG-02, WTG-03, WTG-04, WTG-05, WTG-06, WTG-07, WTG-08, WTG-09, WTG-10, WTG-11, and WTG-12.123456789101112
  • WTG-04 received a ground-based visual inspection of blade B, with nothing new noted.38
  • WTG-03, WTG-04, and WTG-05 are expected to have bat curtailment again at night due to low wind.39
  • WTG-03, WTG-04 and WTG-05 are expected to stop from 22:00 if wind remains low due to bat curtailment, and this should not be reset.40
  • On WTG-04, the 2026-07-02 drone check of blade B found the crack unchanged at 0.9 m.40
  • Rescue kit inspections were performed on WTG-01 to WTG-04 under MP-HSE-01.41

Timeline

  • 2026-06-01: WTG-03, WTG-04, and WTG-05 started S420 Curtailed - environmental condition around 22:00 on 2026-06-01 and ended the curtailment around 05:00 on 2026-06-02.202122232425
  • 2026-07-02: On WTG-04, the 2026-07-02 drone check of blade B found the crack unchanged at 0.9 m.40
  • 2026-08-07: WTG-04 entered S310 Maintenance mode on 2026-08-07, raised and cleared A1001 Emergency stop activated during that maintenance period, and then ended S310.26272829
  • 2026-08-11: WTG-04 raised A2140 Gearbox oil filter differential pressure high at 2.89 bar on 2026-08-11 17:18:08 and cleared it at 1.90 bar on 2026-08-11 18:22:08.3031
  • 2026-08-25: WTG-03, WTG-04 and WTG-05 entered S420 Curtailed - environmental condition at 22:00 on 2026-08-25, and the curtailment ended at 05:00 on 2026-08-26.323334353637
  • 2026-09-08: WO-26-0355 for WTG-04 is a planned high-priority corrective-maintenance work order to replace rotor blade B for a trailing-edge crack, with planned date 2026-09-08 and references WBS-2026-031 and LP-2026-009.16
  • 2026-09-30: For F-01, repair is not recommended at that location and WTG-04 blade B is to be replaced before 2026-09-30.15
  • 2026-09-30: The recommendations are to replace WTG-04 blade B before 2026-09-30 using a crane lift, repair category 3 findings within 6 months using rope access, and perform the next full inspection in May 2027.15
  • 2026-09-30: WTG-04 blade B had a category 4 trailing-edge crack and had to be replaced before 2026-09-30 under WO-26-0355.17

Documents

Sources

Footnotes

  1. Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 5 · OCR ↩ ↩2

  2. Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 6 · OCR ↩ ↩2

  3. Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 9 · OCR ↩ ↩2

  4. Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 10 · OCR ↩ ↩2

  5. Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 11 · OCR ↩ ↩2

  6. Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 13 · OCR ↩ ↩2

  7. Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 12 · OCR ↩ ↩2

  8. Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 14 · OCR ↩ ↩2

  9. Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 16 · OCR ↩ ↩2

  10. Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 18 · OCR ↩ ↩2

  11. Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 20 · OCR ↩ ↩2

  12. Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 21 · OCR ↩ ↩2

  13. Environmental Permit EP-2018-0417 - Quellmoor Ridge Wind Farm (consolidated with variation 2) — p. 2 · ✓ quote verified ↩ ↩2 ↩3 ↩4

  14. Monthly O&M Review Minutes – 2026-06-18 — ¶ 14 · ✓ quote verified ↩ ↩2

  15. Blade inspection report WBS-2026-031 - Quellmoor Ridge Wind Farm (May 2026) — p. 2 · ✓ quote verified ↩ ↩2 ↩3 ↩4 ↩5 ↩6 ↩7 ↩8

  16. Work Orders Export through 2026-08-31 — row 68 · table ↩ ↩2 ↩3

  17. Monthly O&M Review Minutes – 2026-06-18 — ¶ 12 · ✓ quote verified ↩ ↩2 ↩3 ↩4

  18. Blade inspection report WBS-2026-031 - Quellmoor Ridge Wind Farm (May 2026) — p. 1 · ✓ quote verified ↩

  19. Lift Plan LP-2026-009 - WTG-04 Blade B Replacement — p. 1 · OCR ↩ ↩2 ↩3

  20. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 622 · table ↩ ↩2

  21. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 623 · table ↩ ↩2

  22. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 624 · table ↩ ↩2

  23. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 625 · table ↩ ↩2

  24. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 626 · table ↩ ↩2

  25. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 627 · table ↩ ↩2

  26. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1548 · table ↩ ↩2

  27. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1549 · table ↩ ↩2

  28. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1550 · table ↩ ↩2

  29. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1551 · table ↩ ↩2

  30. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1654 · table ↩ ↩2

  31. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1655 · table ↩ ↩2

  32. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1870 · table ↩ ↩2

  33. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1871 · table ↩ ↩2

  34. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1872 · table ↩ ↩2

  35. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1873 · table ↩ ↩2

  36. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1874 · table ↩ ↩2

  37. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1875 · table ↩ ↩2

  38. Shift Handover Note - Day Shift - 18/07/2026 — lines 6–12 · ✓ quote verified ↩

  39. Shift Handover for 2026-07-29 Day Shift — lines 5–14 · ✓ quote verified ↩

  40. Shift handover - 2026-07-15 (day shift to night shift) — lines 11–14 · ✓ quote verified ↩ ↩2 ↩3

  41. Shift handover - 2026-07-15 (day shift to night shift) — lines 18–20 · ✓ quote verified ↩

Provenance badges✓ quote verified the quoted words were found verbatim in the source texttable values parsed deterministically from the cited table rowsOCR text recognised from an image; compare it with the image