Contoso Renewables is the permit holder for Quellmoor Ridge Wind Farm.1 It is also identified as the customer or owner on several current Quellmoor Ridge Wind Farm documents, including maintenance, asset, stock, and safety records.2345678910 The company is described as operating 12 LT-32 turbines at Quellmoor Ridge.11

Facts

  • The permit holder is Contoso Renewables.1
  • The instruction is addressed to Contoso Renewables for Quellmoor Ridge Wind Farm.12
  • Dario Penwarden, O&M Supervisor, acknowledged the instruction for Contoso Renewables on 2026-07-02 at 14:40.12
  • Bram Okkerse of Tailspin Heavy Lift is the appointed person, and Dario Penwarden of Contoso Renewables is the client supervisor.13
  • The customer is Contoso Renewables, Quellmoor Ridge Wind Farm.2
  • The register owner is Yusuf Arkwell, Reliability Engineer at Contoso Renewables.3
  • The document is Contoso Renewables Corporate HSE internal safety audit report AUD-2026-02 for Quellmoor Ridge Wind Farm.4
  • The plan owner is Dario Penwarden, O&M Supervisor at Contoso Renewables.5
  • The document is a Contoso Renewables incident management near-miss report numbered INC-2026-003 and titled "Dropped socket at WTG-11."14
  • The owner is Tomasz Lebrecht, Stores and Spare Parts Coordinator at Contoso Renewables.6
  • The deck is an induction for new staff and contractors by Contoso Renewables dated February 2025.7
  • The HSE Coordinator contact named on the final slide is Greta Vollan, with e-mail greta.vollan@contoso-renewables.example.15
  • The title block identifies the document as the Quellmoor Ridge Wind Farm site layout plan, Rev. C, dated 2024-05-06, for Contoso Renewables, using a local grid in metres.8
  • The form is branded Contoso Renewables.9
  • The original requester stated that Contoso operates 12 LT-32 turbines at Quellmoor Ridge and reported that on 21 January two turbines needed more than 6 hours of heating before start-up at -24.6 degrees C.11
  • The supplier note is dated 03.08.2026 and is addressed to Contoso Renewables at Quellmoor Ridge Wind Farm, with the subject PO-76994 for HSS bearings FGT-P-22328 and notes after the oil changeover.16
  • Tomasz Lebrecht signed as Stores and Spare Parts Coordinator for Contoso Renewables - Quellmoor Ridge Wind Farm.10

Timeline

  • 2024-05-06: The title block identifies the document as the Quellmoor Ridge Wind Farm site layout plan, Rev. C, dated 2024-05-06, for Contoso Renewables, using a local grid in metres.8
  • 2025-02: The deck is an induction for new staff and contractors by Contoso Renewables dated February 2025.7
  • 2026-02: The document is Contoso Renewables Corporate HSE internal safety audit report AUD-2026-02 for Quellmoor Ridge Wind Farm.4
  • 2026-07-02: Dario Penwarden, O&M Supervisor, acknowledged the instruction for Contoso Renewables on 2026-07-02 at 14:40.12

Documents

Sources

Footnotes

  1. Environmental Permit EP-2018-0417 - Quellmoor Ridge Wind Farm (consolidated with variation 2) — p. 1 · ✓ quote verified ↩ ↩2

  2. Oil analysis report TR-OA-2026-0614 - WTG-07 gearbox oil — p. 1 · ✓ quote verified ↩ ↩2

  3. Asset Register 2026 of Quellmoor Ridge Wind Farm, revision 2026-01-12 — sheet "About", row 3 · table ↩ ↩2

  4. Internal safety audit report AUD-2026-02 — p. 1 · ✓ quote verified ↩ ↩2 ↩3

  5. Maintenance Plan 2026, Issue 2 — Quellmoor Ridge Wind Farm — sheet "About", row 3 · table ↩ ↩2

  6. Spare Parts Stock Snapshot 2026-07-21 for Quellmoor Ridge O&M Building — sheet "About", row 4 · table ↩ ↩2

  7. Quellmoor Ridge Wind Farm Onboarding and Site Rules (February 2025) — slide 1 · ✓ quote verified ↩ ↩2 ↩3

  8. Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 23 · OCR ↩ ↩2 ↩3

  9. Daily Turbine Checklist Form CHK-05 for WTG-05, 14/07/2026 — region 3 · OCR ↩ ↩2

  10. Parts shortage - HSS bearing FGT-P-22328 below minimum stock — message body, lines 28–30 · ✓ quote verified ↩ ↩2

  11. Email RE: LWS-TS-48213 Applicability of SB-LWS-2025-07 Rev. A to Quellmoor Ridge — message body, lines 48–51 · paraphrase ↩ ↩2

  12. Curtailment instruction CPL-CI-2026-018 — p. 1 · ✓ quote verified ↩ ↩2 ↩3

  13. Lift Plan LP-2026-009 - WTG-04 Blade B Replacement — p. 1 · OCR ↩

  14. Near-miss Report INC-2026-003: Dropped Socket at WTG-11 — p. 1 · ✓ quote verified ↩

  15. Quellmoor Ridge Wind Farm Onboarding and Site Rules (February 2025) — slide 11 · ✓ quote verified ↩

  16. Fabrikam Supplier Note on PO-76994 HSS Bearings and PWG 220 Follow-up — lines 1–6 · paraphrase ↩

Provenance badges✓ quote verified the quoted words were found verbatim in the source textparaphrase reworded from the source text; numbers checked, no verbatim quotetable values parsed deterministically from the cited table rowsOCR text recognised from an image; compare it with the image