FICTIONAL SAMPLE - Contoso Renewables, Quellmoor Ridge Wind Farm and every organisation, person, product and value in this wiki are invented. Not for operational use.

SOP-WAH-003 is the working at height and rescue procedure.12 It is Revision B and is effective 2026-04-07.1 All work at height must follow SOP-WAH-003.2

Facts

  • SOP-WAH-003 is Revision B and is effective 2026-04-07.1
  • Rescue kit inspection task MP-HSE-01 is scheduled every 6 months and references SOP-WAH-003 section 7.3
  • Fall arrest rail and ladder inspection task MP-HSE-02 is scheduled every 12 months and references SOP-WAH-003.4
  • Corrective action A2 requires making tool tethering mandatory above 2 m and updating SOP-WAH-003; Greta Vollan owns the open action due 2026-04-15.5
  • All work at height must follow SOP-WAH-003.2
  • Superseded: Referenced documents include LWS-MM-GBX-32 Rev. D section 4.3, SOP-LOTO-001, SOP-WAH-003, and oil level check at the sight glass.6

Timeline

  • 2026-04-07: SOP-WAH-003 is Revision B and is effective 2026-04-07.1
  • 2026-04-15: Corrective action A2 requires making tool tethering mandatory above 2 m and updating SOP-WAH-003; Greta Vollan owns the open action due 2026-04-15.5

Documents

Sources

Footnotes

  1. SOP-WAH-003 Revision B - Working at height and rescue — ¶ 2 · ✓ quote verified ↩ ↩2 ↩3 ↩4

  2. Quellmoor Ridge Wind Farm Onboarding and Site Rules (February 2025) — slide 6 · ✓ quote verified ↩ ↩2 ↩3

  3. Maintenance Plan 2026, Issue 2 — Quellmoor Ridge Wind Farm — sheet "Tasks", row 15 · table ↩

  4. Maintenance Plan 2026, Issue 2 — Quellmoor Ridge Wind Farm — sheet "Tasks", row 16 · table ↩

  5. Near-miss Report INC-2026-003: Dropped Socket at WTG-11 — p. 1 · ✓ quote verified ↩ ↩2