A rescue kit is kept in every nacelle and has a sealed kit with a descent device.12 Its seal must be checked every day, and a broken seal means the kit must be inspected before the next climb.12 Rescue kit inspections are scheduled every 6 months under MP-HSE-01.3
Facts
- Each nacelle has a sealed rescue kit with a descent device.1
- A broken rescue kit seal means the kit must be inspected before the next climb.1
- Finding F1 was a major finding: the rescue kit in the WTG-06 nacelle was past its 6-monthly inspection, with last inspection on 2025-06-12 and due date 2025-12-12; the action was to inspect all rescue kits and add the kit seal check to the daily checklist, owned by Greta Vollan and due 2026-03-31.4
- Rescue kit inspection task MP-HSE-01 is scheduled every 6 months and references SOP-WAH-003 section 7.3
- Near the end of the export, WO-26-0444 for WTG-05 is in progress for rescue kit inspection, WO-26-0450 for WTG-11 is waiting for parts for a leaking hydraulic hose in the yaw brake circuit with part AWI-10442 quantity 1, and WO-26-0457 for WTG-03 is open for yaw brake pad inspection.567
- A sealed rescue kit is kept in every nacelle and its seal must be checked every day.2
- WTG-05 rescue kit inspection WO-26-0444 has started and is to finish next week.8
- Rescue kit inspections were performed on WTG-01 to WTG-04 under MP-HSE-01.9
Timeline
- 2025-06-12: Finding F1 was a major finding: the rescue kit in the WTG-06 nacelle was past its 6-monthly inspection, with last inspection on 2025-06-12 and due date 2025-12-12; the action was to inspect all rescue kits and add the kit seal check to the daily checklist, owned by Greta Vollan and due 2026-03-31.4
Documents
- SOP-WAH-003 Revision B - Working at height and rescue
- Internal safety audit report AUD-2026-02
- Maintenance Plan 2026, Issue 2 — Quellmoor Ridge Wind Farm
- Work Orders Export through 2026-08-31
- Monthly O&M Review Minutes – 2026-06-18
- Quellmoor Ridge Wind Farm Onboarding and Site Rules (February 2025)
- Daily Turbine Checklist Form CHK-05 for WTG-05, 14/07/2026
- Shift Handover for 2026-07-29 Day Shift
- Shift handover - 2026-07-15 (day shift to night shift)
Related
- Topics: Blades, pitch bearings and main-component lifts, Cold-climate operation and icing, Environmental permit and night curtailment, Gearbox lubrication and oil changes, Gearbox temperature, vibration and oil analysis, Generator brushes and electrical systems, Grid connection and grid operator instructions, Safety, isolation and work at height, Spare parts, stock levels and supply, Training, site rules and acronyms
Sources
Footnotes
-
SOP-WAH-003 Revision B - Working at height and rescue — ¶ 19 · ✓ quote verified ↩ ↩2 ↩3 ↩4
-
Quellmoor Ridge Wind Farm Onboarding and Site Rules (February 2025) — slide 6 · ✓ quote verified ↩ ↩2 ↩3
-
Maintenance Plan 2026, Issue 2 — Quellmoor Ridge Wind Farm — sheet "Tasks", row 15 · table ↩ ↩2
-
Internal safety audit report AUD-2026-02 — p. 1 · ✓ quote verified ↩ ↩2
-
Shift Handover for 2026-07-29 Day Shift — lines 5–14 · ✓ quote verified ↩
-
Shift handover - 2026-07-15 (day shift to night shift) — lines 18–20 · ✓ quote verified ↩
Provenance badges✓ quote verified the quoted words were found verbatim in the source texttable values parsed deterministically from the cited table rows