A rescue kit is kept in every nacelle and has a sealed kit with a descent device.12 Its seal must be checked every day, and a broken seal means the kit must be inspected before the next climb.12 Rescue kit inspections are scheduled every 6 months under MP-HSE-01.3

Facts

  • Each nacelle has a sealed rescue kit with a descent device.1
  • A broken rescue kit seal means the kit must be inspected before the next climb.1
  • Finding F1 was a major finding: the rescue kit in the WTG-06 nacelle was past its 6-monthly inspection, with last inspection on 2025-06-12 and due date 2025-12-12; the action was to inspect all rescue kits and add the kit seal check to the daily checklist, owned by Greta Vollan and due 2026-03-31.4
  • Rescue kit inspection task MP-HSE-01 is scheduled every 6 months and references SOP-WAH-003 section 7.3
  • Near the end of the export, WO-26-0444 for WTG-05 is in progress for rescue kit inspection, WO-26-0450 for WTG-11 is waiting for parts for a leaking hydraulic hose in the yaw brake circuit with part AWI-10442 quantity 1, and WO-26-0457 for WTG-03 is open for yaw brake pad inspection.567
  • A sealed rescue kit is kept in every nacelle and its seal must be checked every day.2
  • WTG-05 rescue kit inspection WO-26-0444 has started and is to finish next week.8
  • Rescue kit inspections were performed on WTG-01 to WTG-04 under MP-HSE-01.9

Timeline

  • 2025-06-12: Finding F1 was a major finding: the rescue kit in the WTG-06 nacelle was past its 6-monthly inspection, with last inspection on 2025-06-12 and due date 2025-12-12; the action was to inspect all rescue kits and add the kit seal check to the daily checklist, owned by Greta Vollan and due 2026-03-31.4

Documents

Sources

Footnotes

  1. SOP-WAH-003 Revision B - Working at height and rescue — ¶ 19 · ✓ quote verified ↩ ↩2 ↩3 ↩4

  2. Quellmoor Ridge Wind Farm Onboarding and Site Rules (February 2025) — slide 6 · ✓ quote verified ↩ ↩2 ↩3

  3. Maintenance Plan 2026, Issue 2 — Quellmoor Ridge Wind Farm — sheet "Tasks", row 15 · table ↩ ↩2

  4. Internal safety audit report AUD-2026-02 — p. 1 · ✓ quote verified ↩ ↩2

  5. Work Orders Export through 2026-08-31 — row 82 · table ↩

  6. Work Orders Export through 2026-08-31 — row 83 · table ↩

  7. Work Orders Export through 2026-08-31 — row 86 · table ↩

  8. Shift Handover for 2026-07-29 Day Shift — lines 5–14 · ✓ quote verified ↩

  9. Shift handover - 2026-07-15 (day shift to night shift) — lines 18–20 · ✓ quote verified ↩

Provenance badges✓ quote verified the quoted words were found verbatim in the source texttable values parsed deterministically from the cited table rows