FICTIONAL SAMPLE - Contoso Renewables, Quellmoor Ridge Wind Farm and every organisation, person, product and value in this wiki are invented. Not for operational use.
S310 is the status code for Maintenance mode.12 It is used in wind turbine lockout/tagout and SCADA status logs.134567891011121314
Facts
- The isolation sequence starts by informing the control room and setting the turbine to maintenance mode, status S310.1
- The last person checks that tools are removed and guards are fitted before the turbine leaves maintenance mode.2
- WTG-09 had A3210 Generator brush wear limit reached raised on 2026-07-16 and cleared on 2026-07-18; WTG-09 was also in S310 Maintenance mode on 2026-07-18 from 07:58:12 to 11:52:40.3456
- WTG-04 entered S310 Maintenance mode on 2026-08-07, raised and cleared A1001 Emergency stop activated during that maintenance period, and then ended S310.78910
- WTG-02 and WTG-05 entered S310 Maintenance mode on 2026-08-25 in the morning, and both maintenance mode intervals ended later the same day.11121314
Timeline
- 2026-07-16: WTG-09 had A3210 Generator brush wear limit reached raised on 2026-07-16 and cleared on 2026-07-18; WTG-09 was also in S310 Maintenance mode on 2026-07-18 from 07:58:12 to 11:52:40.3456
- 2026-08-07: WTG-04 entered S310 Maintenance mode on 2026-08-07, raised and cleared A1001 Emergency stop activated during that maintenance period, and then ended S310.78910
- 2026-08-25: WTG-02 and WTG-05 entered S310 Maintenance mode on 2026-08-25 in the morning, and both maintenance mode intervals ended later the same day.11121314
Documents
- SOP-LOTO-001 Rev. C - Lockout/tagout of wind turbines
- SCADA alarm and status log, 2026-04-01 to 2026-08-31
Related
- Topics: Cold-climate operation and icing, Environmental permit and night curtailment, Gearbox lubrication and oil changes, Gearbox temperature, vibration and oil analysis, Generator brushes and electrical systems, Grid connection and grid operator instructions, Safety, isolation and work at height
Sources
Footnotes
-
SOP-LOTO-001 Rev. C - Lockout/tagout of wind turbines — ¶ 15 · ✓ quote verified ↩ ↩2 ↩3
-
SOP-LOTO-001 Rev. C - Lockout/tagout of wind turbines — ¶ 24 · ✓ quote verified ↩ ↩2
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1281 · table ↩ ↩2 ↩3
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1317 · table ↩ ↩2 ↩3
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1313 · table ↩ ↩2 ↩3
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1318 · table ↩ ↩2 ↩3
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1548 · table ↩ ↩2 ↩3
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1549 · table ↩ ↩2 ↩3
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1550 · table ↩ ↩2 ↩3
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1551 · table ↩ ↩2 ↩3
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1850 · table ↩ ↩2 ↩3
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1851 · table ↩ ↩2 ↩3
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1856 · table ↩ ↩2 ↩3
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1857 · table ↩ ↩2 ↩3