FICTIONAL SAMPLE - Contoso Renewables, Quellmoor Ridge Wind Farm and every organisation, person, product and value in this wiki are invented. Not for operational use.

WTG-05 is a turbine at Quellmoor Ridge Wind Farm and is part of the environmental permit curtailment group WTG-03 to WTG-05.12345678910111213 It is subject to bat protection curtailment at night from 1 June to 31 August when wind is low and temperature is 10 °C or higher.1415 Current records also show a rescue kit inspection work order in progress for WTG-05.16171819

Facts

  • From 1 June to 31 August each year, WTG-03, WTG-04 and WTG-05 must be stopped between 22:00 and 05:00 local time whenever hub-height wind speed is below 6.0 m/s and air temperature is 10 °C or higher.14
  • Variation 2 was justified by the presence of a protected bat species maternity roost in Skelvane Wood, east of WTG-03, WTG-04 and WTG-05, with foraging near the turbines on warm, calm summer nights.14
  • WTG-03, WTG-04, and WTG-05 started S420 Curtailed - environmental condition around 22:00 on 2026-06-01 and ended the curtailment around 05:00 on 2026-06-02.202122232425
  • WTG-05 raised A4105 Pitch system fault with value 1 axis on 2026-08-03, started S510 Stopped - fault, then cleared A4105 and ended S510 about two hours later.26272829
  • WTG-02 and WTG-05 entered S310 Maintenance mode on 2026-08-25 in the morning, and both maintenance mode intervals ended later the same day.30313233
  • WTG-03, WTG-04 and WTG-05 entered S420 Curtailed - environmental condition at 22:00 on 2026-08-25, and the curtailment ended at 05:00 on 2026-08-26.343536373839
  • Near the end of the export, WO-26-0444 for WTG-05 is in progress for rescue kit inspection, WO-26-0450 for WTG-11 is waiting for parts for a leaking hydraulic hose in the yaw brake circuit with part AWI-10442 quantity 1, and WO-26-0457 for WTG-03 is open for yaw brake pad inspection.161718
  • The bat protection curtailment season started on 1 June for WTG-03, WTG-04, and WTG-05 under permit condition 7.3.15
  • The turbine labels shown on the plan are WTG-01, WTG-02, WTG-03, WTG-04, WTG-05, WTG-06, WTG-07, WTG-08, WTG-09, WTG-10, WTG-11, and WTG-12.123456789101112
  • WTG-03 to WTG-05 are labelled as an environmental permit curtailment group.13
  • The completed checklist is dated 14/07/2026, identifies the turbine as WTG-05 in the OCR text, and lists technician C. Rydings.404142
  • WTG-05 rescue kit inspection WO-26-0444 has started and is to finish next week.19
  • WTG-03, WTG-04, and WTG-05 are expected to have bat curtailment again at night due to low wind.19
  • WTG-03, WTG-04 and WTG-05 are expected to stop from 22:00 if wind remains low due to bat curtailment, and this should not be reset.43
  • The WTG-05 daily checklist CHK-05 was completed yesterday with all items OK.44

Timeline

Documents

Sources

Footnotes

  1. Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 5 · OCR ↩ ↩2

  2. Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 6 · OCR ↩ ↩2

  3. Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 9 · OCR ↩ ↩2

  4. Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 10 · OCR ↩ ↩2

  5. Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 11 · OCR ↩ ↩2

  6. Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 13 · OCR ↩ ↩2

  7. Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 12 · OCR ↩ ↩2

  8. Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 14 · OCR ↩ ↩2

  9. Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 16 · OCR ↩ ↩2

  10. Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 18 · OCR ↩ ↩2

  11. Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 20 · OCR ↩ ↩2

  12. Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 21 · OCR ↩ ↩2

  13. Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 8 · OCR ↩ ↩2

  14. Environmental Permit EP-2018-0417 - Quellmoor Ridge Wind Farm (consolidated with variation 2) — p. 2 · ✓ quote verified ↩ ↩2 ↩3

  15. Monthly O&M Review Minutes – 2026-06-18 — ¶ 14 · ✓ quote verified ↩ ↩2

  16. Work Orders Export through 2026-08-31 — row 82 · table ↩ ↩2

  17. Work Orders Export through 2026-08-31 — row 83 · table ↩ ↩2

  18. Work Orders Export through 2026-08-31 — row 86 · table ↩ ↩2

  19. Shift Handover for 2026-07-29 Day Shift — lines 5–14 · ✓ quote verified ↩ ↩2 ↩3

  20. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 622 · table ↩ ↩2

  21. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 623 · table ↩ ↩2

  22. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 624 · table ↩ ↩2

  23. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 625 · table ↩ ↩2

  24. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 626 · table ↩ ↩2

  25. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 627 · table ↩ ↩2

  26. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1524 · table ↩ ↩2

  27. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1525 · table ↩ ↩2

  28. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1526 · table ↩ ↩2

  29. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1527 · table ↩ ↩2

  30. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1850 · table ↩ ↩2

  31. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1851 · table ↩ ↩2

  32. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1856 · table ↩ ↩2

  33. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1857 · table ↩ ↩2

  34. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1870 · table ↩ ↩2

  35. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1871 · table ↩ ↩2

  36. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1872 · table ↩ ↩2

  37. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1873 · table ↩ ↩2

  38. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1874 · table ↩ ↩2

  39. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1875 · table ↩ ↩2

  40. Daily Turbine Checklist Form CHK-05 for WTG-05, 14/07/2026 — region 5 · OCR ↩

  41. Daily Turbine Checklist Form CHK-05 for WTG-05, 14/07/2026 — region 6 · OCR ↩

  42. Daily Turbine Checklist Form CHK-05 for WTG-05, 14/07/2026 — region 7 · OCR ↩

  43. Shift handover - 2026-07-15 (day shift to night shift) — lines 11–14 · ✓ quote verified ↩

  44. Shift handover - 2026-07-15 (day shift to night shift) — lines 18–20 · ✓ quote verified ↩

Provenance badges✓ quote verified the quoted words were found verbatim in the source texttable values parsed deterministically from the cited table rowsOCR text recognised from an image; compare it with the image