WTG-09 is a wind turbine at Quellmoor Ridge Wind Farm.123456789101112 Its gearbox oil conversion to PWG 220 is pending under SB-LWS-2025-07, and the completed gearbox oil conversion work order WO-25-0309 is recorded separately.1314 In 2026, WTG-09 had a generator brush replacement work order completed and a leading-edge erosion finding on blade C.1516
Facts
- On 2025-01-21 at -24.6 °C, WTG-02 and WTG-09 needed more than 6 hours of heating before starting.17
- Finding F-04 is category 3 leading-edge erosion on WTG-09 blade C, with erosion between radius 50 m and 57 m, exposed laminate over 0.3 m, and a required leading-edge repair within 6 months.15
- WTG-09 has gearbox oil conversion to PWG 220 pending and deferred under SB-LWS-2025-07.13
- On 2026-04-01, icing alarms A7001 led to S600 Stopped - icing status starts for WTG-12, WTG-09, WTG-03, and WTG-02, with later clears and S600 ends recorded for each turbine in this part.1819202122232425
- On 2026-04-02, WTG-08 and WTG-09 raised A2120 Gearbox oil pressure low at 0.59 bar and later cleared at 1.35 bar.26272829
- WTG-09 had A3210 Generator brush wear limit reached raised on 2026-07-16 and cleared on 2026-07-18; WTG-09 was also in S310 Maintenance mode on 2026-07-18 from 07:58:12 to 11:52:40.30313233
- The movements sheet records a 2026-07-18 issue of quantity -1 for LWS-P-51207 against WO-26-0436 for WTG-09.34
- The WTG-09 gearbox oil conversion work order WO-25-0309 was deferred because the access road was closed by snow on 2025-11-24 and was completed on 2026-01-20.14
- WO-26-0436 for WTG-09 replaced generator brushes for A3210, was completed under WI-GEN-014, used part LWS-P-51207 quantity 1, and notes the shortest brush was 16 mm.16
- WTG-09 in 2026-01 recorded availability_pct 96.1, energy_mwh 955.9, downtime_h 29.0, and alarm_count 15.35
- The turbine labels shown on the plan are WTG-01, WTG-02, WTG-03, WTG-04, WTG-05, WTG-06, WTG-07, WTG-08, WTG-09, WTG-10, WTG-11, and WTG-12.123456789101112
- WTG-09 had its generator brushes replaced under work order WO-26-0436 following alarm A3210 from 16/07.36
- For WTG-09, the shortest measured brush was B3 at 16 mm, below the 18 mm threshold in WI-GEN-014.36
- For WTG-09, a complete LWS-P-51207 set was replaced and the brush-holder screws were tightened to 12 N·m.36
- WTG-09 was put through run-in at 50 % power for 8 hours, until 20:00 that evening.36
- The next team was asked to check the end of the WTG-09 run-in at 20:00 and return it to 100 % power.37
- PWG 220 conversion status was: nine turbines completed, WTG-11 being converted that day, WTG-12 scheduled for the following Wednesday, and WTG-09 planned for the twenty-fourth if the access road remained open.3839
- From minus twenty, heaters need about four hours to bring the sump to plus five; the previous January, WTG-02 and WTG-09 needed more than six hours.40
- If WTG-09 still has PWG 320 in January, its start temperature remains plus ten until conversion is complete; the parameter is changed only with the new oil.41
Timeline
- 2025-01-21: On 2025-01-21 at -24.6 °C, WTG-02 and WTG-09 needed more than 6 hours of heating before starting.17
- 2025-07: WTG-09 has gearbox oil conversion to PWG 220 pending and deferred under SB-LWS-2025-07.13
- 2025-11-24: The WTG-09 gearbox oil conversion work order WO-25-0309 was deferred because the access road was closed by snow on 2025-11-24 and was completed on 2026-01-20.14
- 2026-01: WTG-09 in 2026-01 recorded availability_pct 96.1, energy_mwh 955.9, downtime_h 29.0, and alarm_count 15.35
- 2026-04-01: On 2026-04-01, icing alarms A7001 led to S600 Stopped - icing status starts for WTG-12, WTG-09, WTG-03, and WTG-02, with later clears and S600 ends recorded for each turbine in this part.1819202122232425
- 2026-04-02: On 2026-04-02, WTG-08 and WTG-09 raised A2120 Gearbox oil pressure low at 0.59 bar and later cleared at 1.35 bar.26272829
- 2026-07-16: WTG-09 had A3210 Generator brush wear limit reached raised on 2026-07-16 and cleared on 2026-07-18; WTG-09 was also in S310 Maintenance mode on 2026-07-18 from 07:58:12 to 11:52:40.30313233
- 2026-07-18: The movements sheet records a 2026-07-18 issue of quantity -1 for LWS-P-51207 against WO-26-0436 for WTG-09.34
Documents
- Environmental Permit EP-2018-0417 - Quellmoor Ridge Wind Farm (consolidated with variation 2)
- MOC-2025-012 - Gearbox Oil Grade Change to PWG 220
- Blade inspection report WBS-2026-031 - Quellmoor Ridge Wind Farm (May 2026)
- SOP-GBX-010 Rev. B - Gearbox oil change
- SOP-WAH-003 Revision B - Working at height and rescue
- WI-GEN-014 Rev. A - Generator Brush Replacement
- Asset Register 2026 of Quellmoor Ridge Wind Farm, revision 2026-01-12
- Maintenance Plan 2026, Issue 2 — Quellmoor Ridge Wind Farm
- SCADA alarm and status log, 2026-04-01 to 2026-08-31
- Spare Parts Stock Snapshot 2026-07-21 for Quellmoor Ridge O&M Building
- Work Orders Export through 2026-08-31
- KPI Export 2026-H1
- Quellmoor Ridge Wind Farm Onboarding and Site Rules (February 2025)
- Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C
- Email RE: LWS-TS-48213 Applicability of SB-LWS-2025-07 Rev. A to Quellmoor Ridge
- Shift Handover Note - Day Shift - 18/07/2026
- Toolbox Talk: Cold-Weather Start-Up After PWG 220 Conversion
- SOP-GBX-010 - Gearbox oil change, Revision A (superseded)
Related
- Topics: Blades, pitch bearings and main-component lifts, Cold-climate operation and icing, Environmental permit and night curtailment, Gearbox lubrication and oil changes, Gearbox temperature, vibration and oil analysis, Generator brushes and electrical systems, Grid connection and grid operator instructions, Safety, isolation and work at height, Spare parts, stock levels and supply, Training, site rules and acronyms
Sources
Footnotes
-
Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 5 · OCR ↩ ↩2
-
Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 6 · OCR ↩ ↩2
-
Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 9 · OCR ↩ ↩2
-
Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 10 · OCR ↩ ↩2
-
Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 11 · OCR ↩ ↩2
-
Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 13 · OCR ↩ ↩2
-
Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 12 · OCR ↩ ↩2
-
Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 14 · OCR ↩ ↩2
-
Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 16 · OCR ↩ ↩2
-
Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 18 · OCR ↩ ↩2
-
Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 20 · OCR ↩ ↩2
-
Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 21 · OCR ↩ ↩2
-
Asset Register 2026 of Quellmoor Ridge Wind Farm, revision 2026-01-12 — sheet "Turbines", row 10 · table ↩ ↩2 ↩3
-
Work Orders Export through 2026-08-31 — row 10 · table ↩ ↩2 ↩3
-
Blade inspection report WBS-2026-031 - Quellmoor Ridge Wind Farm (May 2026) — p. 2 · ✓ quote verified ↩ ↩2
-
MOC-2025-012 - Gearbox Oil Grade Change to PWG 220 — ¶ 6 · ✓ quote verified ↩ ↩2
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 4 · table ↩ ↩2
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 5 · table ↩ ↩2
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 6 · table ↩ ↩2
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 7 · table ↩ ↩2
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 8 · table ↩ ↩2
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 9 · table ↩ ↩2
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 12 · table ↩ ↩2
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 13 · table ↩ ↩2
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 32 · table ↩ ↩2
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 33 · table ↩ ↩2
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 34 · table ↩ ↩2
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 35 · table ↩ ↩2
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1281 · table ↩ ↩2
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1317 · table ↩ ↩2
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1313 · table ↩ ↩2
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1318 · table ↩ ↩2
-
Spare Parts Stock Snapshot 2026-07-21 for Quellmoor Ridge O&M Building — sheet "Movements", row 10 · table ↩ ↩2
-
KPI Export 2026-H1 — row 10 · table ↩ ↩2
-
Shift Handover Note - Day Shift - 18/07/2026 — lines 6–12 · ✓ quote verified ↩ ↩2 ↩3 ↩4
-
Shift Handover Note - Day Shift - 18/07/2026 — lines 14–15 · ✓ quote verified ↩
-
Toolbox Talk: Cold-Weather Start-Up After PWG 220 Conversion — 00:11–00:19 · ✓ quote verified ↩
-
Toolbox Talk: Cold-Weather Start-Up After PWG 220 Conversion — 00:19–00:27 · ✓ quote verified ↩
-
Toolbox Talk: Cold-Weather Start-Up After PWG 220 Conversion — 00:45–00:56 · ✓ quote verified ↩
-
Toolbox Talk: Cold-Weather Start-Up After PWG 220 Conversion — 01:15–01:23 · ✓ quote verified ↩
Provenance badges✓ quote verified the quoted words were found verbatim in the source texttable values parsed deterministically from the cited table rowsOCR text recognised from an image; compare it with the image