City Power & Light - Network Control

FICTIONAL - NOT FOR OPERATIONAL USE

Curtailment instruction CPL-CI-2026-018

Planned network outage

Field: To; Value: Contoso Renewables, Quellmoor Ridge Wind Farm

Field: Connection point; Value: Skelvane 132 kV substation, circuit 2

Field: Reason; Value: Planned maintenance of Skelvane 132 kV circuit 1; the network runs on a single circuit

Limit the active power export at the connection point to 20 MW on 14, 15 and 16 July 2026, each day from 08:00 to 18:00 local time.

- When the limit ends, restore the export with a ramp rate of at most 5 MW per minute.

- Acknowledge this instruction within 48 hours.

- Export above the limit by more than 1 MW for more than 5 minutes will be reported.

- Network Control may extend the outage; any extension is confirmed by phone and in writing.

Acknowledged for Contoso Renewables by Dario Penwarden, O&M Supervisor, on 2026-07-02 at 14:40.

Network Control duty engineer, City Power & Light (available 24/7).

Table t01

RowFieldValue
2Issued2026-07-02 10:15
3ToContoso Renewables, Quellmoor Ridge Wind Farm
4Connection pointSkelvane 132 kV substation, circuit 2
5ReasonPlanned maintenance of Skelvane 132 kV circuit 1; the network runs on a single circuit