FICTIONAL SAMPLE - Contoso Renewables, Quellmoor Ridge Wind Farm and every organisation, person, product and value in this wiki are invented. Not for operational use.
This City Power & Light Network Control instruction orders a planned curtailment for Quellmoor Ridge Wind Farm during a network outage. It gives the export limit schedule, ramp-rate condition, acknowledgement requirement, reporting threshold, and acknowledgement details.
Key facts
- The document is a City Power & Light Network Control curtailment instruction for a planned network outage, numbered CPL-CI-2026-018.1
- The document is marked fictional and not for operational use.1
- The instruction was issued on 2026-07-02 at 10:15.1
- The instruction is addressed to Contoso Renewables for Quellmoor Ridge Wind Farm.1
- The connection point is Skelvane 132 kV substation, circuit 2.1
- The reason for the instruction is planned maintenance of Skelvane 132 kV circuit 1 while the network runs on a single circuit.1
- Active power export at the connection point must be limited to 20 MW on 14, 15 and 16 July 2026, each day from 08:00 to 18:00 local time.1
- The export-limit schedule lists 20 MW from 08:00 to 18:00 on 2026-07-14.1
- The export-limit schedule lists 20 MW from 08:00 to 18:00 on 2026-07-15.1
- The export-limit schedule lists 20 MW from 08:00 to 18:00 on 2026-07-16.1
- When the limit ends, export must be restored with a ramp rate of at most 5 MW per minute.1
- The instruction must be acknowledged within 48 hours.1
- Export above the limit by more than 1 MW for more than 5 minutes will be reported.1
- Network Control may extend the outage, and any extension is confirmed by phone and in writing.1
- Dario Penwarden, O&M Supervisor, acknowledged the instruction for Contoso Renewables on 2026-07-02 at 14:40.1
- The Network Control duty engineer at City Power & Light is available 24/7.1
Contents
Document status
City Power & Light Network Control issued this document as curtailment instruction CPL-CI-2026-018 for a planned network outage.2
The document is marked fictional and not for operational use.2
Outage context
The instruction was issued to Contoso Renewables for Quellmoor Ridge Wind Farm.2
The connection point is Skelvane 132 kV substation, circuit 2.2
The stated reason is planned maintenance of Skelvane 132 kV circuit 1, with the network running on a single circuit.2
The source table contains the issued time, addressee, connection point, and reason.2
Table t01 · p. 1
| Row | Field | Value |
|---|---|---|
| 2 | Issued | 2026-07-02 10:15 |
| 3 | To | Contoso Renewables, Quellmoor Ridge Wind Farm |
| 4 | Connection point | Skelvane 132 kV substation, circuit 2 |
| 5 | Reason | Planned maintenance of Skelvane 132 kV circuit 1; the network runs on a single circuit |
Agents can query this table as t01 with the query_table tool.
Curtailment instruction
Active power export at the connection point must be limited to 20 MW on 14, 15 and 16 July 2026, each day from 08:00 to 18:00 local time.2
The export-limit table gives the daily entries for 2026-07-14, 2026-07-15, and 2026-07-16.2
When the limit ends, export must be restored with a ramp rate of at most 5 MW per minute.2
The instruction must be acknowledged within 48 hours.2
Export above the limit by more than 1 MW for more than 5 minutes will be reported.2
Network Control may extend the outage, and any extension is confirmed by phone and in writing.2
Table t02 · p. 1
| Row | Date | From | To | Export limit |
|---|---|---|---|---|
| 2 | 2026-07-14 | 08:00 | 18:00 | 20 MW |
| 3 | 2026-07-15 | 08:00 | 18:00 | 20 MW |
| 4 | 2026-07-16 | 08:00 | 18:00 | 20 MW |
Agents can query this table as t02 with the query_table tool.
Acknowledgement and contact
Dario Penwarden, O&M Supervisor, acknowledged the instruction for Contoso Renewables on 2026-07-02 at 14:40.2
The Network Control duty engineer at City Power & Light is available 24/7.2
Figures
No figures were extracted from this document.
Related
- Asset: Quellmoor Ridge Wind Farm
- Organisations: City Power & Light, Contoso Renewables
- Topics: Environmental permit and night curtailment, Grid connection and grid operator instructions
Sources
Footnotes
-
Curtailment instruction CPL-CI-2026-018 — p. 1 · ✓ quote verified ↩ ↩2 ↩3 ↩4 ↩5 ↩6 ↩7 ↩8 ↩9 ↩10 ↩11 ↩12 ↩13 ↩14 ↩15 ↩16
-
Curtailment instruction CPL-CI-2026-018 — p. 1 · paraphrase ↩ ↩2 ↩3 ↩4 ↩5 ↩6 ↩7 ↩8 ↩9 ↩10 ↩11 ↩12 ↩13 ↩14