City Power & Light is a utility organisation connected to the Skelvane 132 kV substation and the Quellmoor Ridge Wind Farm site.123 Its Network Control issues curtailment instructions for planned network outages, including CPL-CI-2026-018.4 City Power & Light also announced July network works on the Skelvane 132 kV circuits.5
Facts
- The document is a City Power & Light Network Control curtailment instruction for a planned network outage, numbered CPL-CI-2026-018.4
- The Network Control duty engineer at City Power & Light is available 24/7.4
- The Quellmoor Ridge substation is a 33/132 kV substation with one 45 MVA transformer, located next to the O&M building, with connection to City Power & Light, Skelvane 132 kV substation, circuit 2.1
- City Power & Light announced July network works on the Skelvane 132 kV circuits, with the formal curtailment instruction expected in early July.5
- The site connects to City Power & Light at the Skelvane 132 kV substation.2
- A 132 kV line is labelled as going to Skelvane substation, with City Power & Light named in the label.3
Timeline
No dated facts.
Documents
- Curtailment instruction CPL-CI-2026-018
- Asset Register 2026 of Quellmoor Ridge Wind Farm, revision 2026-01-12
- Monthly O&M Review Minutes – 2026-06-18
- Quellmoor Ridge Wind Farm Onboarding and Site Rules (February 2025)
- Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C
Related
- Topics: Blades, pitch bearings and main-component lifts, Cold-climate operation and icing, Environmental permit and night curtailment, Gearbox temperature, vibration and oil analysis, Grid connection and grid operator instructions, Safety, isolation and work at height, Spare parts, stock levels and supply, Training, site rules and acronyms
Sources
Footnotes
-
Asset Register 2026 of Quellmoor Ridge Wind Farm, revision 2026-01-12 — sheet "Other assets", row 2 · table ↩ ↩2
-
Quellmoor Ridge Wind Farm Onboarding and Site Rules (February 2025) — slide 2 · ✓ quote verified ↩ ↩2
-
Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 24 · OCR ↩ ↩2
-
Curtailment instruction CPL-CI-2026-018 — p. 1 · ✓ quote verified ↩ ↩2 ↩3
-
Monthly O&M Review Minutes – 2026-06-18 — ¶ 18 · ✓ quote verified ↩ ↩2
Provenance badges✓ quote verified the quoted words were found verbatim in the source texttable values parsed deterministically from the cited table rowsOCR text recognised from an image; compare it with the image