Source page: Quellmoor Ridge Wind Farm Onboarding and Site Rules (February 2025) · Original file: original.pptx · Provenance: ✓ quote verified (native text)

Text

12 Litware LT-32 turbines in CCV configuration, WTG-01 to WTG-12, 38.4 MW
Commercial operation since 15 October 2019
Hub height 92 m, rotor diameter 118 m
Grid connection to City Power & Light at the Skelvane 132 kV substation
O&M building with workshop and stores at the site entrance