Contoso Renewables - Corporate HSE

FICTIONAL - NOT FOR OPERATIONAL USE

Internal safety audit report AUD-2026-02

Quellmoor Ridge Wind Farm

- The PTW system is well used and permits are closed correctly.

- Lockout boards are clear and up to date.

- The rescue drill on WTG-06 lowered the casualty to the ground in 9 minutes (target 15 minutes).

The site meets the corporate standard. The major finding F1 must be closed before 2026-03-31 and verified by the HSE Coordinator. The status of all actions is reviewed at the monthly O&M review.

Ruth Kessington, Corporate HSE Auditor, Contoso Renewables - 2026-03-06.

Table t01

RowFieldValue
2Audit dates2026-02-16 to 2026-02-17
3Report date2026-03-06
4AuditorRuth Kessington, Corporate HSE Auditor
5Site teamMaren Ellingsby (Site Manager), Dario Penwarden (O&M Supervisor), Greta Vollan (HSE Coordinator)
6ScopePTW system, lockout/tagout, working at height and rescue, lifting equipment, oil and chemical handling, training records, emergency arrangements
7MethodDocument review, interviews and observation of two jobs (filter change on WTG-02, rescue drill on WTG-06)
8Overall score86 % (target 85 %)