FICTIONAL SAMPLE - Contoso Renewables, Quellmoor Ridge Wind Farm and every organisation, person, product and value in this wiki are invented. Not for operational use.

WTG-11 is a turbine at Quellmoor Ridge Wind Farm.123456789101112 Current records note a category 3 root gelcoat crack on blade C, a small hydraulic oil leak at the yaw brake hose, and a gearbox oil sump temperature high alarm on WTG-11.13141516 WTG-11 also had a dropped-object near miss at the yaw deck hatch, and corrective work installed tool tether anchor points there.1718

Facts

  • Finding F-05 is a category 3 root gelcoat crack on WTG-11 blade C, located at radius 3.2 m, with repair within 6 months and a check at the next inspection.13
  • Finding F5 was a minor finding: dropped-object exclusion signage was absent at the tower base of WTG-11 during nacelle work; the action was to provide a portable exclusion signage set for each turbine, owned by Callum Rydings and due 2026-03-31.19
  • The document is a Contoso Renewables incident management near-miss report numbered INC-2026-003 and titled "Dropped socket at WTG-11."17
  • The incident was recorded as occurring on 2026-03-24 at 10:40 at WTG-11, yaw deck hatch, and was classified as a near miss involving a dropped object with high potential severity.17
  • Corrective action A1 requires installing tool tether anchor points at the yaw deck hatches, first at WTG-11 under WO-26-0203 and then on all turbines; Callum Rydings owns the open action due 2026-04-30.17
  • On 2026-04-01, WTG-11 raised A5001 Yaw misalignment at 15.1 deg and cleared it at 4.2 deg.2021
  • WTG-11 raised A2101 Gearbox oil sump temperature high at 75.1 °C on 2026-08-12 16:05:02 and cleared it at 72.7 °C on 2026-08-12 16:14:40.1415
  • During WTG-11 maintenance on 2026-08-16, A1001 Emergency stop activated was raised at 10:05:47 and cleared at 10:16:47.2223
  • WO-26-0203 installed tool tether anchor points at the WTG-11 yaw deck hatch, was completed as high-priority corrective maintenance, and used part AWI-31007 quantity 1 under reference INC-2026-003.18
  • Near the end of the export, WO-26-0444 for WTG-05 is in progress for rescue kit inspection, WO-26-0450 for WTG-11 is waiting for parts for a leaking hydraulic hose in the yaw brake circuit with part AWI-10442 quantity 1, and WO-26-0457 for WTG-03 is open for yaw brake pad inspection.242526
  • The turbine labels shown on the plan are WTG-01, WTG-02, WTG-03, WTG-04, WTG-05, WTG-06, WTG-07, WTG-08, WTG-09, WTG-10, WTG-11, and WTG-12.123456789101112
  • WTG-11 had a small hydraulic oil leak at a yaw brake hose found on the day of the handover.16
  • The AWI-10442 hose for WTG-11 is not stocked and an order is to be raised.16
  • The WTG-11 leak was contained with absorbent pads and is checked every shift.16
  • PWG 220 conversion status was: nine turbines completed, WTG-11 being converted that day, WTG-12 scheduled for the following Wednesday, and WTG-09 planned for the twenty-fourth if the access road remained open.2728

Timeline

  • 2026-03-24: The incident was recorded as occurring on 2026-03-24 at 10:40 at WTG-11, yaw deck hatch, and was classified as a near miss involving a dropped object with high potential severity.17
  • 2026-03-31: Finding F5 was a minor finding: dropped-object exclusion signage was absent at the tower base of WTG-11 during nacelle work; the action was to provide a portable exclusion signage set for each turbine, owned by Callum Rydings and due 2026-03-31.19
  • 2026-04-01: On 2026-04-01, WTG-11 raised A5001 Yaw misalignment at 15.1 deg and cleared it at 4.2 deg.2021
  • 2026-04-30: Corrective action A1 requires installing tool tether anchor points at the yaw deck hatches, first at WTG-11 under WO-26-0203 and then on all turbines; Callum Rydings owns the open action due 2026-04-30.17
  • 2026-08-12: WTG-11 raised A2101 Gearbox oil sump temperature high at 75.1 °C on 2026-08-12 16:05:02 and cleared it at 72.7 °C on 2026-08-12 16:14:40.1415
  • 2026-08-16: During WTG-11 maintenance on 2026-08-16, A1001 Emergency stop activated was raised at 10:05:47 and cleared at 10:16:47.2223

Documents

Sources

Footnotes

  1. Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 5 · OCR ↩ ↩2

  2. Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 6 · OCR ↩ ↩2

  3. Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 9 · OCR ↩ ↩2

  4. Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 10 · OCR ↩ ↩2

  5. Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 11 · OCR ↩ ↩2

  6. Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 13 · OCR ↩ ↩2

  7. Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 12 · OCR ↩ ↩2

  8. Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 14 · OCR ↩ ↩2

  9. Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 16 · OCR ↩ ↩2

  10. Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 18 · OCR ↩ ↩2

  11. Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 20 · OCR ↩ ↩2

  12. Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 21 · OCR ↩ ↩2

  13. Blade inspection report WBS-2026-031 - Quellmoor Ridge Wind Farm (May 2026) — p. 2 · ✓ quote verified ↩ ↩2

  14. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1660 · table ↩ ↩2 ↩3

  15. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1661 · table ↩ ↩2 ↩3

  16. Shift Handover for 2026-07-29 Day Shift — lines 5–14 · ✓ quote verified ↩ ↩2 ↩3 ↩4

  17. Near-miss Report INC-2026-003: Dropped Socket at WTG-11 — p. 1 · ✓ quote verified ↩ ↩2 ↩3 ↩4 ↩5 ↩6

  18. Work Orders Export through 2026-08-31 — row 43 · table ↩ ↩2

  19. Internal safety audit report AUD-2026-02 — p. 1 · ✓ quote verified ↩ ↩2

  20. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 2 · table ↩ ↩2

  21. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 3 · table ↩ ↩2

  22. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1676 · table ↩ ↩2

  23. SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1677 · table ↩ ↩2

  24. Work Orders Export through 2026-08-31 — row 82 · table ↩

  25. Work Orders Export through 2026-08-31 — row 83 · table ↩

  26. Work Orders Export through 2026-08-31 — row 86 · table ↩

  27. Toolbox Talk: Cold-Weather Start-Up After PWG 220 Conversion — 00:11–00:19 · ✓ quote verified ↩

  28. Toolbox Talk: Cold-Weather Start-Up After PWG 220 Conversion — 00:19–00:27 · ✓ quote verified ↩

Provenance badges✓ quote verified the quoted words were found verbatim in the source texttable values parsed deterministically from the cited table rowsOCR text recognised from an image; compare it with the image