Source page: Shift handover - 2026-07-15 (day shift to night shift) · Original file: original.txt · Provenance: ✓ quote verified (native text)

Text

- Grid curtailment day 2 of 3 (CPL-CI-2026-018): park export limited to 20 MW from 08:00 to 18:00. All turbines back to normal at 18:00.
- WTG-03, WTG-04 and WTG-05 will stop tonight from 22:00 if the wind stays low (bat curtailment). This is normal, do not reset.
- WTG-07: HSS bearing vibration still around 5.3 mm/s. Oil temperature normal since the fan motor replacement. WO-26-0412 is waiting for the bearing.
- WTG-04: drone check of blade B on 2026-07-02, crack unchanged at 0.9 m.