WTG-03 is a turbine listed on the Quellmoor Ridge Wind Farm site layout plan.123456789101112 It is part of the environmental permit curtailment group with WTG-04 and WTG-05.13 Current records also show bat curtailment, yaw brake pad inspection, and a yaw misalignment alarm for WTG-03.141516171819202122232425262728293031323334
Facts
- From 1 June to 31 August each year, WTG-03, WTG-04 and WTG-05 must be stopped between 22:00 and 05:00 local time whenever hub-height wind speed is below 6.0 m/s and air temperature is 10 °C or higher.14
- Variation 2 was justified by the presence of a protected bat species maternity roost in Skelvane Wood, east of WTG-03, WTG-04 and WTG-05, with foraging near the turbines on warm, calm summer nights.14
- On 2026-04-01, icing alarms A7001 led to S600 Stopped - icing status starts for WTG-12, WTG-09, WTG-03, and WTG-02, with later clears and S600 ends recorded for each turbine in this part.3536373839404142
- WTG-03, WTG-04, and WTG-05 started S420 Curtailed - environmental condition around 22:00 on 2026-06-01 and ended the curtailment around 05:00 on 2026-06-02.151617181920
- WTG-03, WTG-04 and WTG-05 entered S420 Curtailed - environmental condition at 22:00 on 2026-08-25, and the curtailment ended at 05:00 on 2026-08-26.212223242526
- WTG-03 had A5001 Yaw misalignment raised at 18.9 deg and cleared at 4.2 deg on 2026-08-31.2728
- Near the end of the export, WO-26-0444 for WTG-05 is in progress for rescue kit inspection, WO-26-0450 for WTG-11 is waiting for parts for a leaking hydraulic hose in the yaw brake circuit with part AWI-10442 quantity 1, and WO-26-0457 for WTG-03 is open for yaw brake pad inspection.293031
- The bat protection curtailment season started on 1 June for WTG-03, WTG-04, and WTG-05 under permit condition 7.3.32
- The turbine labels shown on the plan are WTG-01, WTG-02, WTG-03, WTG-04, WTG-05, WTG-06, WTG-07, WTG-08, WTG-09, WTG-10, WTG-11, and WTG-12.123456789101112
- WTG-03 to WTG-05 are labelled as an environmental permit curtailment group.13
- WTG-03, WTG-04, and WTG-05 are expected to have bat curtailment again at night due to low wind.33
- WTG-03, WTG-04 and WTG-05 are expected to stop from 22:00 if wind remains low due to bat curtailment, and this should not be reset.34
- Radiator cleaning MP-GBX-07 on WTG-03 was postponed to next week.43
Timeline
- 2026-04-01: On 2026-04-01, icing alarms A7001 led to S600 Stopped - icing status starts for WTG-12, WTG-09, WTG-03, and WTG-02, with later clears and S600 ends recorded for each turbine in this part.3536373839404142
- 2026-06-01: WTG-03, WTG-04, and WTG-05 started S420 Curtailed - environmental condition around 22:00 on 2026-06-01 and ended the curtailment around 05:00 on 2026-06-02.151617181920
- 2026-08-25: WTG-03, WTG-04 and WTG-05 entered S420 Curtailed - environmental condition at 22:00 on 2026-08-25, and the curtailment ended at 05:00 on 2026-08-26.212223242526
- 2026-08-31: WTG-03 had A5001 Yaw misalignment raised at 18.9 deg and cleared at 4.2 deg on 2026-08-31.2728
Documents
- Environmental Permit EP-2018-0417 - Quellmoor Ridge Wind Farm (consolidated with variation 2)
- MOC-2025-012 - Gearbox Oil Grade Change to PWG 220
- Blade inspection report WBS-2026-031 - Quellmoor Ridge Wind Farm (May 2026)
- SOP-GBX-010 Rev. B - Gearbox oil change
- SOP-WAH-003 Revision B - Working at height and rescue
- WI-GEN-014 Rev. A - Generator Brush Replacement
- Asset Register 2026 of Quellmoor Ridge Wind Farm, revision 2026-01-12
- Maintenance Plan 2026, Issue 2 — Quellmoor Ridge Wind Farm
- SCADA alarm and status log, 2026-04-01 to 2026-08-31
- Work Orders Export through 2026-08-31
- KPI Export 2026-H1
- Monthly O&M Review Minutes – 2026-06-18
- Quellmoor Ridge Wind Farm Onboarding and Site Rules (February 2025)
- Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C
- Email RE: LWS-TS-48213 Applicability of SB-LWS-2025-07 Rev. A to Quellmoor Ridge
- Shift Handover for 2026-07-29 Day Shift
- Shift handover - 2026-07-15 (day shift to night shift)
- SOP-GBX-010 - Gearbox oil change, Revision A (superseded)
Related
- Topics: Blades, pitch bearings and main-component lifts, Cold-climate operation and icing, Environmental permit and night curtailment, Gearbox lubrication and oil changes, Gearbox temperature, vibration and oil analysis, Generator brushes and electrical systems, Grid connection and grid operator instructions, Safety, isolation and work at height, Spare parts, stock levels and supply, Training, site rules and acronyms
Sources
Footnotes
-
Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 5 · OCR ↩ ↩2
-
Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 6 · OCR ↩ ↩2
-
Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 9 · OCR ↩ ↩2
-
Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 10 · OCR ↩ ↩2
-
Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 11 · OCR ↩ ↩2
-
Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 13 · OCR ↩ ↩2
-
Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 12 · OCR ↩ ↩2
-
Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 14 · OCR ↩ ↩2
-
Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 16 · OCR ↩ ↩2
-
Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 18 · OCR ↩ ↩2
-
Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 20 · OCR ↩ ↩2
-
Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 21 · OCR ↩ ↩2
-
Quellmoor Ridge Wind Farm Site Layout Plan - Rev. C — region 8 · OCR ↩ ↩2
-
Environmental Permit EP-2018-0417 - Quellmoor Ridge Wind Farm (consolidated with variation 2) — p. 2 · ✓ quote verified ↩ ↩2 ↩3
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 622 · table ↩ ↩2 ↩3
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 623 · table ↩ ↩2 ↩3
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 624 · table ↩ ↩2 ↩3
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 625 · table ↩ ↩2 ↩3
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 626 · table ↩ ↩2 ↩3
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 627 · table ↩ ↩2 ↩3
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1870 · table ↩ ↩2 ↩3
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1871 · table ↩ ↩2 ↩3
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1872 · table ↩ ↩2 ↩3
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1873 · table ↩ ↩2 ↩3
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1874 · table ↩ ↩2 ↩3
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1875 · table ↩ ↩2 ↩3
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1898 · table ↩ ↩2 ↩3
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 1899 · table ↩ ↩2 ↩3
-
Monthly O&M Review Minutes – 2026-06-18 — ¶ 14 · ✓ quote verified ↩ ↩2
-
Shift Handover for 2026-07-29 Day Shift — lines 5–14 · ✓ quote verified ↩ ↩2
-
Shift handover - 2026-07-15 (day shift to night shift) — lines 11–14 · ✓ quote verified ↩ ↩2
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 4 · table ↩ ↩2
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 5 · table ↩ ↩2
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 6 · table ↩ ↩2
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 7 · table ↩ ↩2
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 8 · table ↩ ↩2
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 9 · table ↩ ↩2
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 12 · table ↩ ↩2
-
SCADA alarm and status log, 2026-04-01 to 2026-08-31 — row 13 · table ↩ ↩2
-
Shift handover - 2026-07-15 (day shift to night shift) — lines 18–20 · ✓ quote verified ↩
Provenance badges✓ quote verified the quoted words were found verbatim in the source texttable values parsed deterministically from the cited table rowsOCR text recognised from an image; compare it with the image