A rotor blade is a component used in the WTG-04 Blade B replacement job, which is described as a single blade lift.1 WO-26-0355 is a planned high-priority corrective-maintenance work order for WTG-04 to replace rotor blade B because of a trailing-edge crack.2
Facts
- The job is the WTG-04 rotor blade B replacement, described as a single blade lift.1
- WO-26-0355 for WTG-04 is a planned high-priority corrective-maintenance work order to replace rotor blade B for a trailing-edge crack, with planned date 2026-09-08 and references WBS-2026-031 and LP-2026-009.2
Timeline
- 2026-09-08: WO-26-0355 for WTG-04 is a planned high-priority corrective-maintenance work order to replace rotor blade B for a trailing-edge crack, with planned date 2026-09-08 and references WBS-2026-031 and LP-2026-009.2
Documents
- Environmental Permit EP-2018-0417 - Quellmoor Ridge Wind Farm (consolidated with variation 2)
- Blade inspection report WBS-2026-031 - Quellmoor Ridge Wind Farm (May 2026)
- Lift Plan LP-2026-009 - WTG-04 Blade B Replacement
- Maintenance Plan 2026, Issue 2 — Quellmoor Ridge Wind Farm
- SCADA alarm and status log, 2026-04-01 to 2026-08-31
- Work Orders Export through 2026-08-31
- Monthly O&M Review Minutes – 2026-06-18
- Quellmoor Ridge Wind Farm Onboarding and Site Rules (February 2025)
- Shift Handover Note - Day Shift - 18/07/2026
- Shift handover - 2026-07-15 (day shift to night shift)
- Toolbox Talk: Cold-Weather Start-Up After PWG 220 Conversion
Related
- Topics: Blades, pitch bearings and main-component lifts, Cold-climate operation and icing, Environmental permit and night curtailment, Gearbox lubrication and oil changes, Gearbox temperature, vibration and oil analysis, Generator brushes and electrical systems, Grid connection and grid operator instructions, Safety, isolation and work at height, Spare parts, stock levels and supply, Training, site rules and acronyms
Sources
Footnotes
-
Lift Plan LP-2026-009 - WTG-04 Blade B Replacement — p. 1 · OCR ↩ ↩2
-
Work Orders Export through 2026-08-31 — row 68 · table ↩ ↩2 ↩3
Provenance badgestable values parsed deterministically from the cited table rowsOCR text recognised from an image; compare it with the image