This is Wingtip Blade Services' blade inspection report WBS-2026-031 for Quellmoor Ridge Wind Farm in May 2026. It covers a drone visual and ground-photography inspection of 36 blades, with detailed category 3 and category 4 findings and related repair, replacement, monitoring, and follow-up recommendations.
Key facts
- The report covers Quellmoor Ridge Wind Farm, which is recorded as having 12 Litware LT-32 turbines and 36 blades of 57.5 m.1
- The inspection dates were 2026-05-18 to 2026-05-22.1
- The inspection method was drone visual inspection with three passes per blade and ground photography.1
- The report date was 2026-06-03 and the lead inspector was Leilani Hartfield.1
- Across the inspection, 36 blades were inspected; there was one category 4 finding, four category 3 findings, and eleven blades with category 2 damage.1
- Category 3 means significant damage and requires repair within 6 months.1
- Category 4 means serious damage and requires repair or replacement within 3 months plus monthly drone checks.1
- Category 5 means critical damage and requires stopping the turbine.1
- WTG-04 had the highest overall blade category in the turbine summary: blade A category 2, blade B category 4, blade C category 2, and highest category 4.1
- Finding F-01 is a category 4 trailing-edge crack on WTG-04 blade B.2
- For F-01, blade serial LB575-19-1187 had a 0.9 m trailing-edge crack along the bond line between radius 37.6 m and 38.5 m, close to the spar cap.2
- For F-01, repair is not recommended at that location and WTG-04 blade B is to be replaced before 2026-09-30.2
- Until WTG-04 blade B is replaced, the crack is to be checked by drone every month and the turbine is to be stopped immediately if the crack exceeds 1.2 m.2
- Finding F-02 is category 3 leading-edge erosion on WTG-04 blade B, with coating loss between radius 52 m and 57 m and no exposed laminate.2
- Finding F-03 is category 3 lightning receptor damage on WTG-08 blade A; the tip receptor is burnt, the receptor is to be replaced within 6 months, and continuity of the down conductor is to be checked.2
- Finding F-04 is category 3 leading-edge erosion on WTG-09 blade C, with erosion between radius 50 m and 57 m, exposed laminate over 0.3 m, and a required leading-edge repair within 6 months.2
- Finding F-05 is a category 3 root gelcoat crack on WTG-11 blade C, located at radius 3.2 m, with repair within 6 months and a check at the next inspection.2
- The recommendations are to replace WTG-04 blade B before 2026-09-30 using a crane lift, repair category 3 findings within 6 months using rope access, and perform the next full inspection in May 2027.2
Contents
Report identification and scope
Wingtip Blade Services identifies this document as blade inspection report WBS-2026-031 for Quellmoor Ridge Wind Farm in May 2026.3
The client is Contoso Renewables.3 The site is recorded as Quellmoor Ridge Wind Farm with 12 x Litware LT-32 and 36 blades of 57.5 m.3 The inspection dates were 2026-05-18 to 2026-05-22, the report date was 2026-06-03, and the lead inspector was Leilani Hartfield.3
The method was drone visual inspection with three passes per blade and ground photography.3 The document carries a fictional, not-for-operational-use banner.3
Table t01 · p. 1
| Row | Field | Value |
|---|---|---|
| 2 | Client | Contoso Renewables |
| 3 | Site | Quellmoor Ridge Wind Farm, 12 x Litware LT-32, 36 blades of 57.5 m |
| 4 | Inspection dates | 2026-05-18 to 2026-05-22 |
| 5 | Method | Drone visual inspection (three passes per blade) and ground photography |
| 6 | Report date | 2026-06-03 |
| 7 | Lead inspector | Leilani Hartfield |
Agents can query this table as t01 with the query_table tool.
Summary and category scale
The inspection covered 36 blades.3 The summary reports one category 4 finding on WTG-04 blade B, four category 3 findings, and eleven blades with category 2 damage; all other blades were category 0 or 1.3
The report defines category 0 as no damage with no required action and category 1 as cosmetic with no required action.3 Category 2 is minor damage to be monitored at the next inspection.3 Category 3 is significant damage requiring repair within 6 months.3 Category 4 is serious damage requiring repair or replacement within 3 months and a monthly drone check.3 Category 5 is critical damage requiring the turbine to be stopped.3
The turbine-level summary records WTG-04 as the only turbine with highest category 4.3 WTG-08, WTG-09, and WTG-11 each have highest category 3.3
Table t02 · p. 1
| Row | Category | Meaning | Required action |
|---|---|---|---|
| 2 | 0 | No damage | none |
| 3 | 1 | Cosmetic | none |
| 4 | 2 | Minor | monitor at the next inspection |
| 5 | 3 | Significant | repair within 6 months |
| 6 | 4 | Serious | repair or replace within 3 months; monthly drone check |
| 7 | 5 | Critical | stop the turbine |
Agents can query this table as t02 with the query_table tool.
Table t03 · p. 1
| Row | Turbine | Blade A | Blade B | Blade C | Highest |
|---|---|---|---|---|---|
| 2 | WTG-01 | 1 | 1 | 2 | 2 |
| 3 | WTG-02 | 1 | 2 | 1 | 2 |
| 4 | WTG-03 | 2 | 1 | 1 | 2 |
| 5 | WTG-04 | 2 | 4 | 2 | 4 |
| 6 | WTG-05 | 1 | 1 | 1 | 1 |
| 7 | WTG-06 | 2 | 1 | 1 | 2 |
| 8 | WTG-07 | 1 | 2 | 1 | 2 |
| 9 | WTG-08 | 3 | 1 | 2 | 3 |
| 10 | WTG-09 | 1 | 1 | 3 | 3 |
| 11 | WTG-10 | 1 | 2 | 1 | 2 |
| 12 | WTG-11 | 2 | 1 | 3 | 3 |
| 13 | WTG-12 | 1 | 1 | 2 | 2 |
Agents can query this table as t03 with the query_table tool.
Detailed findings
- F-01 is a category 4 trailing-edge crack on WTG-04 blade B.4 The blade serial is LB575-19-1187, and the crack is 0.9 m long along the bond line between radius 37.6 m and 38.5 m, close to the spar cap.4 Repair is not recommended at this location, and blade B is to be replaced before 2026-09-30.4 Until replacement, the crack is to be checked by drone every month, and the turbine is to be stopped immediately if the crack exceeds 1.2 m.4 Figure 1 is the report figure for F-01 and F-02 on WTG-04 blade B.5
- F-02 is category 3 leading-edge erosion on WTG-04 blade B.4 The report records coating loss between radius 52 m and 57 m, with laminate not exposed.4
- F-03 is category 3 lightning receptor damage on WTG-08 blade A.4 The tip receptor is burnt, the receptor is to be replaced within 6 months, and continuity of the down conductor is to be checked.4 Figure 2 is the report figure for F-03 on WTG-08 blade A.5
- F-04 is category 3 leading-edge erosion on WTG-09 blade C.4 The erosion is between radius 50 m and 57 m, laminate is exposed over 0.3 m, and leading-edge repair is required within 6 months.4
- F-05 is a category 3 root gelcoat crack on WTG-11 blade C.4 The crack is at radius 3.2 m, with repair required within 6 months and a check at the next inspection.4
Recommendations and preparation
The recommendations are to replace WTG-04 blade B before 2026-09-30, with a crane lift required.4 The category 3 findings are to be repaired within 6 months using rope access.4 The next full inspection is listed as May 2027.4
The report was prepared by Leilani Hartfield, Lead Blade Inspector, Wingtip Blade Services.4
Figures
- Figure f01 (p. 2): Figure 1 - Findings F-01 and F-02 on WTG-04 blade B. Generated description: A schematic outline of a wind turbine blade labeled “WTG-04 blade B,” shown in side view with a dashed centerline and a 0 m to 50 m scale along the bottom. An orange marked area near the blade tip is labeled “LE erosion (cat. 3)” with “LE,” and a red marker below the mid-to-tip section is labeled “TE crack 0.9 m (cat. 4)” with “TE.”.5
- Figure f02 (p. 2): Figure 2 - Finding F-03 on WTG-08 blade A. Generated description: A simple line diagram of a tapered wing planform labeled “WT-02 blade A,” with the wing outlined in black and a dashed centerline running horizontally through it. Distance marks along the bottom are labeled in meters at 0, 10, 20, 30, 40, and 50 m, and the right end is annotated with “receptor (cat. 3)” above a small orange square near the “LE” label, with “TE” marked below near the trailing edge.5
Related
- Assets: Quellmoor Ridge Wind Farm, WTG-01, WTG-02, WTG-03, WTG-04, WTG-05, WTG-06, WTG-07, WTG-08, WTG-09, WTG-10, WTG-11, WTG-12
- Component: rotor blade
- Product: Litware LT-32
- Status code: S100 Running
- Organisations: Contoso Renewables, Litware Wind Systems, Wingtip Blade Services
- Topics: Blades, pitch bearings and main-component lifts, Safety, isolation and work at height
Sources
Footnotes
-
Blade inspection report WBS-2026-031 - Quellmoor Ridge Wind Farm (May 2026) — p. 1 · ✓ quote verified ↩ ↩2 ↩3 ↩4 ↩5 ↩6 ↩7 ↩8 ↩9
-
Blade inspection report WBS-2026-031 - Quellmoor Ridge Wind Farm (May 2026) — p. 2 · ✓ quote verified ↩ ↩2 ↩3 ↩4 ↩5 ↩6 ↩7 ↩8 ↩9
-
Blade inspection report WBS-2026-031 - Quellmoor Ridge Wind Farm (May 2026) — p. 1 · paraphrase ↩ ↩2 ↩3 ↩4 ↩5 ↩6 ↩7 ↩8 ↩9 ↩10 ↩11 ↩12 ↩13 ↩14 ↩15
-
Blade inspection report WBS-2026-031 - Quellmoor Ridge Wind Farm (May 2026) — p. 2 · paraphrase ↩ ↩2 ↩3 ↩4 ↩5 ↩6 ↩7 ↩8 ↩9 ↩10 ↩11 ↩12 ↩13 ↩14 ↩15 ↩16
-
Blade inspection report WBS-2026-031 - Quellmoor Ridge Wind Farm (May 2026) — p. 2 · generated description ↩ ↩2 ↩3 ↩4
Provenance badges✓ quote verified the quoted words were found verbatim in the source textparaphrase reworded from the source text; numbers checked, no verbatim quotegenerated description written by a model to describe a figure; not a quote